Loading Samples into Load-Lock
-
Ensure load-lock valve is closed.
-
click “CLOSE VALVE” in “LL CONTROLS” box
-
-
Start the venting procedure
-
click “VENT”
-
Loosen the loadlock door to ensure it does over-pressure.
-
-
Wait for door to open, this will happen once load-lock is vented (approx. 5 mins).
-
The pressure should be approximately 760 Torr
-
Gently open the load-lock door, do not let it slam.
-
-
Load samples
-
Ensure gloves are used at all times.
-
Grasp the sample plates using the sample tab with tweezers.
-
Gently slide the sample holders into the carousel.
-
Do not bend the retaining clips.
-
-
Use GUI to select sample levels: “1”, “2”, “3”, “4” OR “5” under the LOAD in the “LL CONTROLS”.
-
Ensure you do not place hands in load-lock while moving motors.
-
-
Close door, do not over-tighten, only snug door.
-
Begin evacuation macro
-
click “PUMP”
-
Ensure the power draw once up to speed (1350 Hz) is not more than 10W.
-
If the power exceeds 15W contact beamline staff.
-
It may be that the door has a hair/paper on the seal. Vent the loadlock and check the door.
-
-
Wait until pressure is less than 5e-07 Torr before attempting any sample transfers.
Transfer Sample Plate from Load-Lock into Main Chamber
-
Ensure pressure in load-lock is less than 5e-07 Torr.
-
Grab sample plate holder with transfer arm.
-
Click to sample level “1 to 5” under the “TRAN” position of the carousel to select a sample plate.
-
Use the transfer arm to grasp sample plate, do not force the pincers, just reposition and retry.
-
Ensure that when the sample plate is facing you in the load-lock that the the “T” and not the “B” is visible on the pincers.
-
Smoothly retract the sample transfer arm fully.
-
-
Move load-lock out of the way by clicking “OUT”
-
Move sample stage into transfer position using moveSS tran in the SPEC terminal or by clicking “TRAN” in “ES CONTROLS” box.
-
Ensure the beamline valve and shutter are closed.
-
Click “CLOSE SHUTTER” and “CLOSE VALVE” on the “ES CONTROLS”
-
-
Open the load-lock valve.
-
click ”OPEN VALVE” in ”LL CONTROLS” box
-
-
Using the transfer arm, move the sample plate into the main chamber.
-
While grasping both cams, smoothly slide the sample plate into the holder.
-
You will need to rotate the sample so it is vertical before insertion (do not rotate until the sample plate has cleared the load-lock valve).
-
-
Fully retract load-lock arm
-
Close the load-lock valve once the sample arm is fully retracted.
-
click ”CLOSE VALVE” in ”LL CONTROLS” box
-
-
Move sample stage to the measure position using moveSS meas in the SPEC terminal or by clicking “MEAS” in the “ES CONTROLS”
Transfer Sample Plate from Main Chamber into Load-Lock
-
Ensure pressure in load-lock is less than 5e-07 Torr.
-
Ensure the beamline valve and shutter are closed.
-
Click “CLOSE SHUTTER” and “CLOSE VALVE” on the “ES CONTROLS”
-
-
Move sample stage to the measure position using moveSS tran in the SPEC terminal or by clicking “TRAN” in the “ES CONTROLS”
-
Move load-lock out of the way by clicking “OUT”
-
Open the load-lock valve.
-
click ”OPEN VALVE” in ”LL CONTROLS” box
-
-
Move the transfer arm into the main chamber, ensure the “T” on the upper pincer is visible.
-
Grasp the sample plate.
-
Do not force the pincers, just reposition and retry.
-
You will need to rotate the sample plate such that it is level before retracting the transfer arm fully (ensure you rotate the sample plate level before the sample plate proceeds through the load-lock valve).
-
-
Fully retract transfer arm
-
Close the load-lock valve once the sample arm is fully retracted.
-
click ”CLOSE VALVE” in ”LL CONTROLS” box
-
-
Select the sample tray you wish to place the sample into.
-
Click to sample level “1 to 5” under the TRAN position of the carousel to select a sample plate.
-
-
Gently slide the sample plate into the ladder and release the pincer.
-
Fully retract the sample transfer arm.
-